WY FLAP NAT 505 & BL 6409(1) Casper Mtn Cir Dr & Muddy Mtn Rd
Agency: | |
---|---|
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159867376847462 |
Posted Date: | Sep 25, 2023 |
Due Date: | |
Source: | https://sam.gov/opp/2bc7373f25... |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
- Contract Opportunity Type: Presolicitation (Original)
- All Dates/Times are: (UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA
- Original Published Date: Sep 25, 2023 11:33 am EDT
- Original Response Date:
- Inactive Policy: Manual
- Original Inactive Date: Oct 25, 2023
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
-
NAICS Code:
- 237310 - Highway, Street, and Bridge Construction
-
Place of Performance:
Casper , WYUSA
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
PROJECT NUMBER: WY FLAP NAT 505 & BL 6409(1)
PROJECT NAME: Casper Mtn Cir Dr & Muddy Mtn Rd
PROJECT DESCRIPTION:
Minor widening/reconstruction and resurfacing, restoration, and rehabilitation (3R) project in Natrona County, Wyoming (approximately 8 miles south of Casper, Wyoming). The proposed project is 12 miles long, generally extending from the intersection of Casper Mountain Circle Drive and Hogadon Road to South Circle Drive, and then continues along Muddy Mountain Road and ends at the Bureau of Land Management (BLM) Campground Loop. The route is used primarily as residential and recreational access to Muddy Mountain and is on rolling terrain with survey elevations ranging from 7,425 feet to 8,292 feet.
Proposed improvements include one base schedule and 2 options:
- Schedule A: BLM Muddy Mountain Road improvements
- Option X: County Casper Mountain Circle Drive improvements (S-Curve and new pavement portion)
- Option Y: County Casper Mountain Circle Drive improvements (Full Depth Reclamation [FDR])
SCOPE OF THE WORK:
Both the Schedule and Options require coordination with the County and BLM during construction activities. Casper Mountain Circle Drive provides access to many private residences and Muddy Mountain Road provides access to campgrounds.
Schedule A:
Muddy Mountain Road is approximately 7.49 miles in length and is aggregate surfaced. The project improvements will rehabilitate and resurface the 4.55 miles of two-lane road and 2.83 miles of single lane aggregate surfaced roads. There are two segments of Muddy Mountain Road consisting of steep grades where new pavement is proposed. There will be four new parking areas, with two of the areas modifying existing parking areas. Additionally, there is a snow fence that will be replaced.
Option X:
The Casper Mountain Circle Drive segment is 2.33 miles are aggregate surfaced with proposed new pavement. The new typical section will consist of 11-foot lanes and 1-foot shoulders. Additional improvements include curve widening of an S-curve area, reconditioning ditches, adding culverts, and pavement markings and delineators.
Option Y:
Casper Mountain Circle Drive is approximately 2.65 miles of existing pavement is fatigued and nearing the end of its serviceable life with proposed FDR. Additional improvements include sub excavation, reconditioning ditches, adding culverts, and pavement markings and delineators.
PRINCIPAL WORK ITEMS:
Schedule A:
30110-0000 AGGREGATE SURFACE COURSE 27,800 tons
30202-2000 ROADWAY AGGREGATE, METHOD 2 4,300 tons
40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO
60704-0000 CLEANING CULVERT IN PLACE 72 each
61901-0000 FENCE (SNOW FENCE) 900 linear feet
61904-0000 BOLLARD POST 297 each
Option X:
20402-0000 SUBEXCAVATION 200 cubic yards
30110-0000 AGGREGATE SURFACE COURSE 13,000tons
40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO
60802-0400 PAVED WATERWAY, TYPE 4 1,300 linear feet
Option Y:
20402-0000 SUBEXCAVATION 1,100 cubic yards
30202-2000 ROADWAY AGGREGATE, METHOD 2 2,700 tons
30401-5500 FULL DEPTH RECLAMATION, METHOD 2, 8-INCH DEPTH 2.400 mile
40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO
It is anticipated this project will be advertised in September 2023, and awarded in November 2023. Construction will run from May 2024 thru September 2024. Due to weather restrictions, the site is not accessible from November to May.
The estimated price range of the project work is between $10 million and $20 million.
- 12300 W. DAKOTA AVE
- LAKEWOOD , CO 80228
- USA
- Leslie Karsten
- CFLAcquisitions@dot.gov
- Sep 25, 2023 11:33 am EDTPresolicitation (Original)
- May 11, 2023 11:59 pm EDT Sources Sought (Original)